"Tianjiang New Materials Technology Co., Ltd. Jiangsu Environmental Emergency Response Plan" Compilation Instructions
Source: Jiangsu Taiter New Material Technology Co., Ltd. Time: 2019-11-22

"Jiangsu Teite New Material Technology Co., Ltd. Emergency Plan for Environmental Emergencies"

Preparation instructions


编制过程概述 1. Overview of the compilation process

In order to strengthen the dynamic management mechanism for emergency plans for environmental emergencies, in accordance with the relevant requirements of the "Administrative Measures for Recording of Emergency Plan for Environmental Emergencies of Enterprises and Institutions (Trial)", enterprises should implement environmental emergency plans at least every three years based on the implementation of environmental emergency plans. The plan was reviewed retrospectively. The latest plan promulgation date of Jiangsu Tatel New Material Technology Co., Ltd. was December 19, 2016 (plan number TTE-EHS-14-16 and plan version number YA-2016-1). Due to the company's new RTO device and three workshops, Jiangsu Guoheng Safety Evaluation Consulting Service Co., Ltd. is now entrusted to guide the revision of the Jiangsu Taiteer New Material Technology Co., Ltd. Environmental Emergency Response Plan (TTE-EHS-11-19 , Plan version number YA-2019-2).

This preplan is a plan formulated for the rapid and orderly and effective emergency and rescue operations for the possible environmental emergencies of Jiangsu Taiter New Material Technology Co., Ltd. to reduce the accident losses. It is based on identifying and assessing potential accident risks, types of accidents and the processes that occur, the consequences of the accidents, and the severity of the impacts. It provides emergency agencies and responsibilities, personnel, technology, equipment, facilities, materials, rescue operations and their command and Coordinate specific arrangements in advance.

This plan is applicable to the emergency treatment of Jiangsu Taiteer New Material Technology Co., Ltd. for environmental emergencies.

重点内容说明 2. Key content description

This plan specifies the responsibilities and tasks of emergency command, prevention and early warning, emergency response, information reporting, and after-treatment, including general principles, basic conditions, environmental risk sources and environmental risk assessment, organization and responsibilities, prevention and early warning, information Disposal, emergency response and measures, post-processing, emergency training and drills, rewards and punishments, safeguard measures, review, release and update of plans, implementation and effective time of plans, attachments, drawings, etc.

3. Solicitation of opinions and explanation of adoption

During the preparation of this plan, the suggestions and opinions of relevant industry experts, experts in emergency rescue, leaders of the unit, engineering technicians, operators, and possibly affected residents and unit representatives have been fully listened to, and have been demonstrated to fully absorb their essence And implement it. The emergency plan was used to further amend and improve the plan. It takes the form of a seminar. The minutes are shown in Table 3-1.


Table 3-1 Public participation and consultation forum

Conference Name

Jiangsu Taiteer New Material Technology Co., Ltd. emergency plan for environmental emergencies

Meeting place

Meeting room on the second floor of Jiangsu Taiter New Material Technology Co., Ltd.

meeting time

2019.2.12

host

Yang Sheng

Participants

Zhou Wenqing, Chang Yangjun, Lu Guo, Cao Jiliang, Ding Hong, Chang Weigang, Zhang Chunqin, Dong Zheng, Cao Libing,

Zhai Xuehua (Resident Representative), Shi Xinhong (Resident Representative)

Main contents of the meeting

First, the staff of the company's EHS department introduced the reasons for preparing the plan and the scope of application to the participants. Subsequently, the plan preparation staff introduced the content of the plan (including the risk assessment report, emergency resource investigation report, emergency plan text, and preparation instructions) to the participants. The key content was the types of accidents that the company may have and the corresponding emergency response levels, which may produce The scope and extent of the accident, the emergency measures and operating procedures after the accident, the situation of emergency personnel and emergency supplies involved in the accident, and the company's emergency training and drill plan, and the participants will also provide on-site emergency-related areas and facilities , Equipment and supplies were visited.

During the meeting, the participants proposed to further improve various preventive measures, strictly implement the principle of "prevention-oriented", and take the principle of prevention as the main principle, insist on the combination of accident and disaster emergency response and prevention, and do a good job of prevention and normality. Risk assessment, hazard source monitoring, and hidden danger rectification.

After discussion at the meeting, Jiangsu Taiter New Material Technology Co., Ltd. decided to adopt this opinion, adhere to the principle of prevention first in future work, and do a good job of risk assessment, danger source monitoring and rectification of hidden dangers under normal conditions.

4. Explanation of review

Jiangsu Tai Teer New Material Technology Co., Ltd. conducted an internal review of this plan on February 28, 2019. For specific review opinions, please see Annex 11. On March 6, 2019, Jiangsu Tai Teer New Material Technology Co., Ltd. invited local environmental emergency response. Relevant experts in the field, representatives of nearby companies and residents formed a group of experts to review this plan. The expert group and the representatives at the meeting listened carefully to the report of the company's engineering situation and the preparation of the plan, and after the discussion of the expert group, they formed the expert review opinions of this plan. For details, please refer to the attachment.


"Tianjiang New Materials Technology Co., Ltd. Jiangsu Environmental Emergency Response Plan" Compilation Instructions